217-351-5288 800-660-7323 classifieds@news-gazette.com

Classified Ads

Notice of Self Storage Sale

Notice of Self Storage Sale

Please take notice Storage 309 located at 309A S. Staley Rd., Champaign, IL 61822 intends to hold a Auction to enforce its privilege against the following parties at the facility for default of payment of Rent. The sale will occur at the facility listed above on 07-30-2018 at 4:30PM. Unless stated otherwise the description of the contents are household goods and furnishings. Jamie Miller unit #1OD; Troy Deen units #D04 & #E34; Steven Croom unit #E09; Justin Scofield unit #E12; Adam Andersen unit #F19; William Cupples unit #F29; Alford Wilson unit #H11; Alexis White unit #H34; Richard Kasper unit #I36; Rhonda Wilson unit #I42; Arnold Burris unit #J01; Rhonda Newell unit #J16; Lillie Tia Caston unit #J26; Keyana Jackson unit #K32; Grant Scofield unit #K34; Byoung Dong Kim unit #K36; Kevin Valentine unit #K39; May Ragland unit #N01. All property is being stored at the above self-storage facility. This sale may be withdrawn at any time without notice. Certain terms and conditions apply. See manager for details.

1386137 7/13,20


PARKLAND COLLEGE

PARKLAND COLLEGE

2400 West Bradley Avenue Champaign, IL 61821

AV System Upgrades 2018

1.1 SUMMERY/SCOPE OF WORK

A. Scope includes furnishing all materials and equipment, labor, service and performance of tests and operation necessary for the installation of an engineered quality audio system. System is tested for continuity, loads, safe limiting before installation by AV Contractor. AV Contractor provides approved material, cable, electronics, detail drawings, proper speaker aiming, terminations and balancing prior to commissioning and training.

B. AV Contractor shall supply AV fixtures, electronics, hardware and integrated control cabling requirements for a complete and working AV system, optimized, balanced and under 1 year warranty.

C. AV Contractor shall provide limited labor for installation of certain owner supplied items, only as specified herein. No warranty applies for owner provided items that may be coordinated or plugged in.

D. AV Contractor initiates coordination for his work in a timely fashion to EC prior to rough-in with shop submittals, in hand, including plan views and cable route confirmation.

E. Include all shipping costs in the base bid

F. Information concerning the design intent is contained in both the written specification (this document) and in the associated AV system drawings. Where conflicts exist between drawings and system specifications, the AV Contractor must bring discrepancies to the project AE’s attention of the AV consultant prior to bid due date. The most expensive option shall prevail unless otherwise approved by the AV Consultant. Refer to drawings for specific quantity unless quantity is indicated within the project specification. Should a conflict of quantities exist between the drawings and the system specification, the higher quantity shall prevail.

G. EC shall be responsible to clean up, remove and dispose of all debris associated with this work. Maintain cleanliness of the property at all times.

H. This AV system project shall be performed by a single AV contractor.

1.2 INSTRUCTIONS TO BIDDERS

A. General instructions to bidders apply

B. Project Schedule:

1. Interested bidders are strongly encouraged to attend a pre-bid meeting August 9, 2018 10am to be held at the facility which shall include a complete walk through of the project and installation.

2. Final questions are to be submitted no later than August 16, 2018 5:00pm to allow for responses to be shared with all bidding participants. Answers to questions submitted after this date shall not be binding.

3. Submission of bids will be accepted up to August 23, 2018 3:00pm. Bids will be opened August 23, 2018 3:30pm

4. Award of bid shall take place September 19, 2018 following Board meeting.

5. Work to commence as soon as possible after Board approval on September 19,

2018.

6. Substantial completion of audio upgrades by December 3, 2018

7. Final commissioning to be completed by December 20, 2018.

C. Responses submitted late will not be considered. The Vendor is responsible for ensuring that their response is received at the time, date, and place specified. All times are State of Illinois local times. Responses received after the specified date and time may be returned at the Vendor’s request and expense.

D. Bid documents are for estimating/bid purposes and represent bid date conditions known. While each and every minor item may or may not be specified on bid documents, a complete system shall be provided with qualified AV expertise. Notify of any significant discrepancies found, before bidding and attend pre-bid meeting for questions and answers.

E. It is the responsibility of the AV Contractor to verify the completeness of drawings, written specification and schedules and the suitability of devices to meet the specified intent. Any additional equipment, accessories or incidentals that may be required, whether or not specifically mentioned, shall be provided by the AV Contractor without claim for additional payment. It is understood that a complete fully functional system is required.

F. Substitutions may be requested for specified hardware if properly requested and approved in writing prior to bids. All other items are bid as voluntary alternates, if complete material lists are included for evaluation and base bids are also submitted. Voluntary offerings cannot be considered without a base bid per specs and drawings.

1. Requests for substitution shall reference original specification model and show literal equal requested by model number. Provide detailed data for relevant comparison submitted to architect/consultant 10 business days before bid due date for this section. If no response is given, no approval is implied.

2. Verbals will not be binding.

3. Incorporate latest manufacturer “running line” product models for base bid, without product substitution and continue meeting specifications and design intent.

4. Any installed modification required as a result of non- approved substitutions shall be included in the scope of the AV Contractor at his expense without change order.

G. Wire/cable shown is for bid estimating purposes only. Verify homerun circuits, loads, gauge and counts before bidding with actual manufacturer requirements. Drawings, risers and specifications are cooperative. (Work shown on one implies work on the other). Provide spares when in doubt. Coordinate quantities on plans, risers and specifications. Supply higher counts in case of discrepancy or if in doubt.

H. Verify manufacturer’s actual requirements before installation, including cables, power supply and shipping dates in advance for long lead time items. Include necessary or minor transformer isolation, control wiring, jacks, supports, and misc. items as required without extra charge/claim.

I. All documentation, project descriptions, submittal forms and equipment specifications, along with

J. questions regarding this project including but not limited to system design, products chosen, scope of work, shall be made to the AV consultant:

Advanced Audio & Lighting Systems 6707 N. Sheridan Rd.

Peoria, IL 61614

(309) 691-7105

ATTN: Graeme S. Brown graeme@advaudio.com

K. Questions and responses may be made available to all bidding contractors.

L. Bid materials must include:

1. Completed bid form

2. A detailed list of products and materials including manufacturers part numbers, descriptions and quantities

3. AV contractors requesting substitutions to specified equipment must do so in writing no than 3 business days prior to bid due date.

M. All bid materials are to be submitted in hard copy to:

1. Owner representative:

Parkland College

2400 West Bradley Ave Champaign, IL 61822 ATTN: Jim Bustard

jbustard@parkland.edu

2. AV Consultant:

Advanced Audio & Lighting Systems, Inc. 6707 N. Sheridan Rd.

Peoria, IL 61614

ATTN: Graeme S. Brown

graeme@advaudio.com

N. All bidders are welcome to attend the public bid opening at Parkland College, X109. If you chooatsteendt, ytou may contact Jim Bustard, Director, Physical Plant, at 217-351-2211 or e-mail, jbustard@parkland.edu to obtain the results of the bid. No information regarding the recommendation to the Board of Trustees will be released until after the Board of Trustees meet on September 19, 2018.

O. The Board of Trustees of Parkland College reserves the right to reject all or any part of a bid submitted, to waive any technicalities or informalities in the bidding, and to accept bids or combination of a bid deemed most favorable to and in the best interest of the college after all bids have been examined and evaluated. All bidders must fully comply with all local, state, and federal laws regarding bidding on public projects and the performance of services or supplying of goods under a bid.

quantities exist between the drawings and the system specification, the higher quantity shall prevail.

P. EC shall be responsible to clean up, remove and dispose of all debris associated with this work. Maintain cleanliness of the property at all times.

Q. This AV system project shall be performed by a single AV contractor.

1387368 7/22


Power Lift Chair

Power Lift Chair & Recliner, $225. Transport Wheelchair, $70. 4 wheel walker with seat, $45.

$$SOLD!!


Pride

Pride

Power Scooter

4 wheel, new batteries, 300 lb cap, excellent cond, $600 217-369-3442


Private Waterfront Property

Private Waterfront Property

Open House - July 22,
2-4 pm
Rare Find! Don't miss this opportunity to own a unique central Illinois property only 15 min. from C-U. Enjoy a captivating, private retreat on 6 wooded acres overlooking a 5 acre lake. 5 BR, 5 BA, 5500 sq.ft. Custom home with a recently updated kitchen & unique custom features. Barnwood floors, sliding barn doors, custom kitchen island. Fishing, hunting, zip line, beach and more. Heated outbuilding, lawn irrigation. Come & See! Realtors welcome. 374 CR 2600 N., Mahomet. $795,000. Listing at zillow.com 217-369-0326


PUBLIC AUCTION

PUBLIC AUCTION

Seller: I D R Management – Owner: Ivan Richardson

Location: - 1606 Willow View – Urbana, IL 61808

Fri., July 27, 2018 10:00 AM

Food Stand Onsite

Construction Equipment –

Backhoes. Skid loaders Trucks & Campers,

Construction Tools, Shop Equipment

Cook Trailer, Restaurant Equipment

More Info & pictures on Auctionzip.com ID # 38360

Auctioneer's Note: This is an outstanding collection of construction equipment and high-end restaurant equipment. Be on time - large items sell around 12:00 noon. Auction preview on Thursday, July 26th from 10:00 am -4:00 pm.

John Miller Ph: 217-543-2883 Lic. # 441001855

Sam Miller Ph: 217-268-3465 Lic # 441002092

Bob Lamendola Ph:217-259-3410 Guest Auctioneer-Lic # 440000050


PUBLIC NOTICE

PUBLIC NOTICE

ADVERTISING

DEADLINES

PUBLICATION

DAY DEADLINE

MON 4PM THUR

TUE NOON FRI

WED 10AM MON

THURS 10AM TUE

FRI 10AM WED

SAT 4 PM WED

SUN 10AM THURS

PLEASE ALLOW 10 DAYS

FOR LARGER

OR MULTI-COLUMN

PUBLIC NOTICES

Email notices to:

ngnotices@news-gazette.com

1283758


Publication Notice

IN THE CIRCUIT COURT OF THE SIXTH JUDICIAL CIRCUIT CHAMPAIGN COUNTY, ILLINOIS

Ann Welch. Petitioner, v Ricky L Welch, Respondent. 16-D-460

Publication Notice

Notice is given you, RICKY L. WELCH, Respondent, that a Petition for Adjudication of Indirect Civil Contempt (May 30, 2018 Order) has been filed against you and an Order to Show Cause has been entered against you in this Court asking for Order requiring the Respondent to appear in Court and show cause, if any exists, why he should not be held in indirect civil contempt for his refusal to comply with the May 30, 2018; For an adjudication of indirect civil contempt against the Respondent; for issuance of sanctions against the Respondent including but not limited to incarcerating the Respondent until such time as he brings himself into compliance with the May 30, 2018 Order; for an order requiring the Respondent to pay the reasonable attorney’s fees of the Petitioner; for entry of such other and further relief as this Court deems just.

Unless you appear in Courtroom ‘G’ o the Champaign County Courthouse, 101 E. Main St., Urbana, IL 61801, on Aug. 2, 2018, a Judgment and other relief, including a body attachment, may be granted as prayed for in this Petition.

1386571 7/13,20,27


Pug Puppy

Pug Puppy, 1 M, Fawn, AKC, shots, dewormed, ready to go now. $1500 obo. 217-543-2496


Ranger Z 118

Ranger Z 118 1 owner Mercury 150hp, low hours, fortex, 80lb thrust, hot foot, deluxe fiber glass trailer, garage kept, $26,000. 260-4910