217-351-5288 800-660-7323 classifieds@news-gazette.com

Classified Ads

2013 Tundra

2013 Tundra, blk crew cab 4x4 dual exhaust, grill guard, raceline wheels, under 40k mi. 217-274-7066


2016 Chevrolet 2500HD LT

2016 Chevrolet 2500HD LT

White, crew cab, new tires, 79k miles, gas, 4x4, $30,000obo 217-841-5672


217-794-2292 309-699-6231

www.fourwindsRV.com

217-794-2292 309-699-6231


217-892-4783

Kerosene hand lamp: perfect condition, quartered block, $50; Fostoria Century sugar, creamer, tray, $10; glass basket bowl: perfect for Easter décor, $7; German steins, 1960's, heights:9,11,24 in., prices $33, $45, $200. 217-892-4783


344-4665

SCHWINN- Men's 21 speed

Like new. $200.

344-4665


480-0049

Ruger LCP .380, ammo, more, $275. 2 Remington 870 shotguns, 1 Magnum Camo, $275. 1 Tactical $325. FOID Req. 480-0049


648-8506

LR chair $30, DR table $20, TV cabinet $15, 2 drawer file cabinet, new $20, Sweaters, some new $5/$10. 648-8506


649-1786

Nice newer 3 BR home, attached garage. Nice neighborhood. 649-1786


95-

95- 18 1/2 ft Viper dual console bass BOAT, 200 horse xri mercury, stainless prop, motor guide 12/24 volt troling motor, super (60) on the dash, lowrance x-4 pro on the bound, single axle trailer, surge breaks, new tires, clean, clean, always in shed. $7000. 586 -4479


ADVERTISEMENT FOR RFP

ADVERTISEMENT FOR RFP

Champaign CUSD No. 4 is requesting two separate not-to-exceed cost proposals to provide material testing services for Central High School Additions & Renovations and Centennial High School Additions & Renovations. These projects consists of building demolition, excavation, backfill, concrete, steel, masonry, and other various construction activities at both schools.

The construction schedule managed by O'Shea Builders on behalf Champaign CUSD No. 4 is as shown in the available exhibits, including the following project milestones:

Contract Award/Notice to Proceed: Centennial: March 25, 2019, Central: April 22, 2019

Substantial Completion: Centennial: July 31, 2021, Central: July 31, 2022

Final Completion: Centennial: August 31, 2021, Central: August 31, 2022

Sealed bids, in duplicate, will be received by Champaign Community Unit School District #4 up until 2:00PM (CDT) on Monday April 1, 2019.

Deliver Quotes To:

Champaign Community Unit School District #4

502 West Windsor

Champaign, IL 61820

Attn: Mark Roessler, Capital Projects Manager

The sealed envelope should read:

"Champaign Community Unit School District #4

Unit 4 Properties Phase 1 Demolition

Bid Package [__________]"

Bids received after this time may be returned unopened to the bidder.

All bids submitted in accordance with the criteria listed in the project documents, will be publicly opened and read aloud.

The exhibits (construction documents) are available to bidders electronically. These documents are available to bidders through SmartBidNet by contacting Tara Cox at O'Shea Builders:

tarac@osheabuilders.com

Phone: (217) 522-2826 x 126

All communications pertaining to bidding should be submitted to Champaign Community Unit School District #4, attention Mark Roessler (roesslma@u4sd.org).

Scope of Material Testing Services

Your proposal should include the following scope of work. If more or less testing and inspection is required than that specified below for adequate evaluation, such recommendations shall be made to the Owner before proceeding.

• Perform field testing, inspections, provide testing reports, and make professional recommendations in accordance with Divisions 03-Concrete, 05-Metals, Division 31-Earthwork, Division 32-Exterior Improvements.

All testing shall be according to ASTM Standards. Your proposal shall provide unit prices for each item of testing and inspection and the actual final cost will be based on the actual units used. Adequate provisions shall be made such that the resulting total cost of testing and inspection shall represent a "maximum not to exceed" cost. Outline standard notices required to schedule testing and normal working hours for services. State all exclusions from your scope. Include a standard hourly fee schedule for field testing services and engineering services as well as a unit cost schedule of laboratory testing services.

Site visits shall be determined by progress of construction, followed with written documentation of observed construction deficiencies and reporting such to the Owner, Architect and General Contractor.

Insurance requirements, see the Request for Proposal on the District's website.